Pittsburg Downtown Development
Pittsburg, Texas
MHS Planning & Design partnered with the City of Pittsburg to master plan the historic downtown. The focus of the project was to engage the citizens to determine the true needs which included, walk-ability, green spaces, way-finding, enhanced parking opportunities and art. MHS coordinated with TxDOT and the City throughout the planning process to ensure the conceptual plans could be implemented.
The project included updated streetscapes, green space nodes, signage and wayfinding, a converted street to a pedestrian walkway, restroom facility, pavilion and art
Contract Delivery Method:
Master Planning and Conceptual Design
Design Duration:
Start: January 2021
Final Completion: November 2022 (Council Adoption)
Services Provided:
Preliminary Planning
On-site data collection with GIS information
Traffic Analysis
Existing Parking Analysis
One-Way Traffic Circulation Study
Digital Layouts
3D Animation of Development and Green Spaces
Cost Estimating